Six Highways 25 Main Roads In Klang Valley To Be Closed For Asean Summit
Six highways and 25 main roads around the Klang Valley will be closed in stages from Friday (May 23) until May 28, in conjunction with the Asean Summit, to ensure smooth traffic flow.
Bukit Aman Traffic Investigation and Enforcement Department director Yusri Hassan Basri said the roads that would be closed included the routes to the Kuala Lumpur International Airport (KLIA) and Subang; Kuala Lumpur Convention Centre (KLCC), Istana Negara and the accommodation hotels.
The list of roads that will be closed is as follows:
Date: Friday to May 26 (7am until all the delegates arrive in stages)
KLIA Expressway
North-South Expressway Central Link (Elite) (KLIA-Putrajaya)
New Klang Valley Expressway (NKVE) (Subang-Jalan Duta)
Guthrie Corridor Expressway (Guthrie)
North-South Expressway (Plus) (Sg Buloh-Jalan Duta)
Maju Expressway (MEX)
Kuala Lumpur–Seremban Expressway (Sg Besi-City Centre)
Lingkaran Putrajaya
Jalan Istana
Jalan Damansara
Jalan Tun Razak
Jalan Ampang
Jalan Sultan Ismail
Jalan Bukit Bintang
Jalan Imbi
Jalan Parlimen
Jalan Kuching
Date: May 26 (8am until completion of arrivals; 5.30pm until completion of arrivals; and 7pm until arrivals)
Intersection of Jalan Ampang-Jalan P Ramlee
Intersection of Jalan Sultan Ismail-Jalan P Ramlee
Intersection of Jalan Perak-Jalan P Ramlee
Intersection of Jalan Perak-Jalan Pinang
Intersection of Jalan Stonor-Jalan Kia Peng
Intersection of Jalan Stonor-Persiaran KLCC

Date: May 27 (8am to 10.30am)
Intersection of Jalan Ampang-Jalan P Ramlee
Intersection of Jalan Sultan Ismail-Jalan P Ramlee
Intersection of Jalan Perak-Jalan P Ramlee
Intersection of Jalan Perak-Jalan Pinang
Intersection of Jalan Stonor-Jalan Kia Peng
Intersection of Jalan Stonor-Persiaran KLCC
Date: May 27 (11.45am to 1pm)
Jalan Tun Razak
Jalan Mahameru
Jalan Sultan Abdul Halim
Date: May 27 (1.45pm to 3pm)
Jalan Parlimen-Jalan Kuching
Jalan Sultan Ismail
Intersection of Jalan Sultan Ismail-Jalan P Ramlee
Intersection of Jalan Perak-Jalan P Ramlee
Intersection of Jalan Perak-Jalan Pinang
Intersection of Jalan Stonor-Jalan Kia Peng
Intersection of Jalan Stonor-Persiaran KLCC
Date: May 28 (8am)
KLIA Expressway
Elite Expressway (KLIA-Putrajaya)
NKVE Expressway (Subang-Jalan Duta)
Guthrie Expressway
Plus Expressway (Sg Buloh-Jalan Duta)
MEX Expressway
KL-Seremban Expressway (Sg Besi-City Centre)
Lingkaran Putrajaya
Jalan Istana
Jalan Damansara
Jalan Tun Razak
Jalan Ampang
Jalan Sultan Ismail
Jalan Bukit Bintang
Jalan Imbi
Jalan Parlimen
Jalan Kuching
Closure in phases
Yusri said the closure would be done in phases, with each closure to last 30 minutes to enable the convoy or motorcade of the summit participants and guests from each country to reach the destination on time.
He advised the public not to park their vehicles indiscriminately along the roads involved in the closure to ensure smooth traffic flow.
He added that enforcement action would be taken against vehicles parked on the closed roads, including having the vehicles towed away.
In addition, he said that business and heavy vehicles are also not allowed to enter the city centre from 6.30am to 7.30am and from 4.30am from today until May 28.
- Bernama
Artikel ini hanyalah simpanan cache dari url asal penulis yang berkebarangkalian sudah terlalu lama atau sudah dibuang :
http://malaysiansmustknowthetruth.blogspot.com/2025/05/six-highways-25-main-roads-in-klang.html