13th Malaysia Plan A Five Year Plan We Can No Longer Afford


 Over RM50 billion has been committed to mega projects that were never objectively assessed or justified by any rigorous transport demand study.
Following the release of the 13th Malaysia Plan (13MP), costing in excess of RM430 billion, we are compelled to ask if this top-down economic ritual is still relevant, or merely a bureaucratic relic pretending to serve the national interest?
In 1966, when the First Malaysia Plan was tabled, this Soviet-style, command-and-control planning model may have made sense.
Back then, Malaysia was largely agrarian. Export revenues were modest, and central planning filled a vacuum in private sector capacity.
The government was expected to build basic infrastructure, provide essential amenities, engineer industrialisation, and open up new sectors — because no one else could.
But this is 2025, not 1965.
Digital economy
Today’s economy is digital, decentralised, and shaped by global headwinds beyond Putrajaya’s reach.
Yet we continue to believe that a group of civil servants, often disconnected from market realities, can forecast and dictate the next five years of our national economy, and that disruptions won’t happen.
It appears the 13MP authors can’t recognise that AI will displace jobs, energy economics will render fossil fuels irrelevant, or that global trade routes can shift overnight.
This is not just outdated thinking. It is dangerous.
The 11MP, for instance, had proposed the Kulim International Airport (KXP) as a northern aviation base.
KXP had the potential to create a centralised logistics hub, displace the poorly located Penang International Airport, and unlock new value in the under-developed northern central corridor of Perak, Seberang Perai, Kedah and Perlis.
It could have redirected federal investment away from the costly three-island reclamation scheme into a booming industrial park centred in Kulim — a growth centre the northern region actually needs.
Winner takes all
Once freed from airport operations, Bayan Lepas land could have been repurposed into high-value real estate, without Penang Island having to spend billions reclaiming artificial land from the sea.
But that did not happen. The KXP project became mired in political turf wars, opaque interests, and patronage games. It never took off.
In Malaysia’s winner-takes-all policymaking, billions are now being spent on Penang’s land reclamation, airport expansion, an over-glorified Penang LRT with doubtful ridership, and pan-island expressways that serve elite developers more than the rakyat.
The result? Over RM50 billion committed to mega projects that was never assessed objectively or justified by any rigorous transport demand study.
No cost-benefit analysis. No economic sense. Just legacy politics and contracts to be handed out.
This is precisely why five-year plans have lost their credibility.
Too often, they’ve been hijacked by vested interests and reduced to glossy policy documents stuffed with buzzwords — while real, measurable impact is nowhere to be found.
Political theatre
The modern economy doesn’t wait five years. The AI, electric vehicle, hydrogen energy, and quantum computing sectors are evolving every quarter.
Even small businesses now operate on agile models, revolving continuously around market signals rather than fixed timelines.
Yet here we are, clinging to a static planning tool, more useful for political theatre than economic direction.
And what about Sabah and Kelantan? What do they get?
These two poorest states in the country still lack clean water supply and decent road infrastructure.
Except for a small water treatment plant in Machang, Kelantan, the 13MP makes no attempt to provide clean water across all 1.2 million households in Kelantan.
Why are they still waiting for basic services while others enjoy LRT trains they don’t need and expanded airports they barely use?
Where is the national equity in all of this?
Where is the plan to reduce electricity tariffs by leveraging locally generated renewable energy, instead of sustaining costly and outdated fossil-fuel infrastructure?
Why do many households in Sabah — an oil and gas producing state — still lack clean water and round-the-clock electricity supply?
A better way forward
If Putrajaya is serious, Malaysia needs to abandon ceremonial planning and adopt a rolling economic model: quarterly recalibrations, real-time data monitoring, adaptive fiscal allocations, and public scorecards showing what was promised versus delivered.
Even Rafizi Ramli has expressed concern that the 13MP is overloaded with mega projects and is thin on policy reforms.
In truth, we persist with five-year plans not because they work, but because they are a tradition or a ritual. Or more aptly, a political placeholder.
The real question isn’t whether we can afford a five-year plan.
It’s whether we can afford another RM430 billion of debt.
As opposition leader Hamzah Zainudin rightly asked in Parliament on Monday:
“Where is the money going to come from? Do we borrow more? Tax more? Print more?”
Or will we simply leave the next administration to clean up the fiscal mess once this one is done parading its plan?
Perhaps that’s Hamzah’s real concern.
If the baton passes to him after GE16, he inherits the debt, not the headlines. - FMT
The author can be reached at: [email protected]
The views expressed are those of the writer and do not necessarily reflect those of MMKtT.


Artikel ini hanyalah simpanan cache dari url asal penulis yang berkebarangkalian sudah terlalu lama atau sudah dibuang :

http://malaysiansmustknowthetruth.blogspot.com/2025/08/13th-malaysia-plan-five-year-plan-we.html

Kempen Promosi dan Iklan
Kami memerlukan jasa baik anda untuk menyokong kempen pengiklanan dalam website kami. Serba sedikit anda telah membantu kami untuk mengekalkan servis percuma aggregating ini kepada semua.

Anda juga boleh memberikan sumbangan anda kepada kami dengan menghubungi kami di sini
Daganghalal Welcomes Malaysia S Halal Initiative Under The 13th Malaysia Plan

Daganghalal Welcomes Malaysia S Halal Initiative Under The 13th Malaysia Plan

papar berkaitan - pada 1/8/2025 - jumlah : 115 hits
DAGANGHALAL COM the world s largest halal verified B2B e marketplace has hailed the RM611 bil 13th Malaysia Plan which outlines the national target to increase while increasing the sector s gross domestic product contribution to 11 by 2030 ...
Aichr Eyes Binding Human Rights Conventions In Five Year Plan

Aichr Eyes Binding Human Rights Conventions In Five Year Plan

papar berkaitan - pada 1/8/2025 - jumlah : 98 hits
Commission chair Edmund Bon says the plan is intended to address Asean s long standing inability to adopt binding human rights commitments AICHR s five year work plan was submitted to the Asean foreign ministers in Kuala Lumpur earlier this...
Why Malaysia Should Retire 5 Year Economic Plans

Why Malaysia Should Retire 5 Year Economic Plans

papar berkaitan - pada 3/8/2025 - jumlah : 126 hits
Malaysia s five year plans are a legacy of mid 20th century Soviet style central planning Even when they are couched in modern language strategic thrusts key result areas mission critical enablers they still attempt to steer a complex evolv...
13th M Sia Plan Marginalises Chinese Indians

13th M Sia Plan Marginalises Chinese Indians

papar berkaitan - pada 6/8/2025 - jumlah : 101 hits
What is the point of Prime Minister Anwar Ibrahim defending the government s bumiputera policies when the administration has given in other areas to the overall detriment of the country At the same time Anwar defended the 13th Malaysia Plan...
Malaysia S Durian Exports Surge 256pc In Five Years Set To Hit Rm1 5b In 2025 Says Mat Sabu

Malaysia S Durian Exports Surge 256pc In Five Years Set To Hit Rm1 5b In 2025 Says Mat Sabu

papar berkaitan - pada 27/7/2025 - jumlah : 155 hits
Agriculture and Food Security Minister Datuk Seri Mohamad Sabu holds up a Musang King durian during a visit to a durian stall at the 2025 Durian Festival in Gua Musang July 26 2025 Bernama picGUA MUSANG July 26 The Ministry of Agriculture a...
Prism Malaysia Melancarkan Luna Eco Penapis Udara Siri Nexa

Prism Malaysia Melancarkan Luna Eco Penapis Udara Siri Nexa

papar berkaitan - pada 27/7/2025 - jumlah : 165 hits
Luna Eco ialah penyaman udara inverter pertama PRISM menawarkan penyejukan pintar jimat tenaga dari serendah RM899 PRISM menawarkan salah satu jaminan terpanjang di pasaran sehingga 7 tahun Siri Nexa Smart Air Purifier turut diperkenalkan u...
Pecah Rahsia Mig 35 Tawaran Rusia Bagi Malaysia Kini Jet Didedah Spesi

Pecah Rahsia Mig 35 Tawaran Rusia Bagi Malaysia Kini Jet Didedah Spesi

papar berkaitan - pada 26/7/2025 - jumlah : 130 hits
Seronok Dipilih Malaysia Jadi Calon Terbaik MiG 35 Ini Rahsia Spesifikasi Hebatnya Rasa bangga bila dengar berita ni Malaysia dikatakan antara negara yang dipertimbangkan oleh Rusia untuk terima jet pejuang MiG 35 jet moden yang digelar adi...
Anwar Hopes Chief Justice Will Carry Out Duties With Wisdom Integrity

Aidex Cybercon 2025 Mentakrifkan Semula Ai Kepintaran Digital Dan Ketahanan Siber

Polis Thailand Akan Serah Eda Ezrin Kepada Imigresen Malaysia Di Icqs Rantau Panjang

Mentors For Startup Business Owners

Warga Asing Tanam Mayat Kawan Di Tapak Lupus Sampah Ditahan Polis

Elakkan Salah Pasang Ini Antara Kesalahan Selalu Berlaku Bila Gantung Jalur Gemilang

Travel Bajet Ke Pulau Pinang Panduan Lengkap Untuk Percutian Solo Keluarga

Rediscovering Intimacy Through Aroma And Vapor A Deep Dive Into Vapordisiacs


echo '';
Info Dan Sinopsis Drama Berepisod Dendam Seorang Madu Slot Tiara Astro Prima

10 Fakta Biodata Amira Othman Yang Digosip Dengan Fattah Amin Penyanyi Lagu Bila Nak Kahwin

5 Tips Macam Mana Nak Ajak Orang Kita Suka Dating Dengan Kita

Info Dan Sinopsis Drama Berepisod Keluarga Itu Slot Lestary TV3

Bolehkah Manusia Transgender Mencapai Klimaks Selepas Bertukar


Solidariti Aman Keningau Bersama Zara

Simple Trim Healthy Mama Recipe Book

Bihun Goreng Kampung

Eda Ezrin Nur Aida Selesai Ambil Keterangan Lebih 3 Jam

Bubur Lambuk Segera Brahims Mudah Cepat Sedap

Sentuhan Moden Pada Kuih Tradisional Resipi Warisan Yang Berjiwa Kontemporari